Cubic yards, swell and shrinkage
Volume from dimensions, then bank to loose to compacted — the trucking and the borrow, not just the hole.
Pipe slope
Slope from two inverts or the invert from a slope, with the minimum grade for each pipe size.
Stone, tons and coverage
Tons of crusher run or #57 to order, how many loads that is, and how far one load spreads.
Square feet, yards and acres
Area for rectangles, circles and triangles, in all three units — plus what those square yards are in asphalt tons.
Inches to tenths of a foot
Convert a tape reading to decimal feet and back, the way grade stakes and cut sheets are written.
When the quantities are settled, the pricing starts
DirtIQ takes the quantities off the plans, prices them from your own labor, equipment and material costs, and puts a proposal in front of the GC. Built for excavation, grading and site utility contractors.
See what DirtIQ does